HW20 Calendar Plus Web Part for SharePoint 2007 (4.1.49) and SharePoint 2010 (4.1.43):
Bug Fixes:
- When color-coding for the column “Created By,” it was based on the domain name (domainjsmith), not the display name (Jane Smith).
- In Month View, if the item begins on Sunday and it spans multiple days, and Work Week is set to start on Monday, the item fails to appear in the Month View.
- Columns of type: Bamboo Lookup Selector with ‘Allow Multiple Selections’ enabled fails to display in Calendar Plus Web Part item tooltips.
- In certain cases, when filtering Calendar Plus Web Part using the Run-Time View Filter option, items do not appear in the calendar even though they exist in the selected view.
HW45 Task Master, Patch update 2.5.75 07/21/2011:
Bug Fixed:
- Resolved an installation packaging issue. If the Upgrade, Repair, or Install New option is selected while executing product upgrade procedures, Bamboo.Logging.wsp will automatically be redeployed. If the Remove All option is selected, Bamboo.Logging.wsp will be removed. This will cause errors in other Bamboo products. To reinstall, and/or for more information, see the Bamboo Knowledge Base article KB.12708.