Project Management (PM) Central 4.3, available now for SharePoint 2010 and coming soon to
SharePoint 2013, offers great new features as well as small improvements to
optimize your project management experience.
Our product refinements are based largely upon user feedback and take
into account the variety of applications our customers employ. The result is a
product that provides a leap forward in user experience and accessibility,
while focusing on what really matters to an organization for successful project
management.
The list of new improvements is exhaustive, but we’ve
selected a few to highlight below. Here’s a first look at the new features and
improvements included in the latest release:
Enhanced Task Management
We’ve introduced new task management capabilities in PM
Central, powered our Task Master Web Part. The
newly enhanced Web Part offers several new features that improve usability: Project
plans can be copied from Excel and pasted directly into the task interface; tasks
can be indented and outdented to make parent-child relations; Project
schedules and tasks can be reordered through drag-and-drop; and project
managers can quickly communicate with their team sending messages to assignees
directly from the interface.

Improved Risk Charting
Risks charts have been overhauled to synthesize and display
granular data in a more powerful, readable way. With the new Business Value field, as well as the
updated chart interface, users are able to get a sense of a given project’s
risk profile at a glance.

Discussion Board Plus Integration
The Discussions tab now integrates with Discussion
Board Plus (sold separately). The
new project templates using Discussion Board Plus provide users with a powerful
alternative to standard SharePoint discussions.
This includes: sticky posts, custom icons, suggested and verified
answers, private posts and replies, and advanced filtering, tagging and search
capabilities.

Optimized Control Panel
We’ve made it a snap for users to generate and gather reports from the Report Center. We have also provided the ability to enable the Auto Update option across the entire portfolio, which automatically updates the project dates based on the tasks list.

These comprehensive advances, coupled with a more intuitive
interface and setup process, make configuring and using PM Central easier than ever before. Try
online or download a free 30-day trial so that you can experience all the benefits that the latest release of PM Central has to offer.