Following the Critical Path, or, Avoiding Rips in the Fabric of Spacetime

Now that we’ve created some dependencies on our test project, it’s probably time to take another detour from the actual doing and discuss a bit more theory.

If you have any involvement at all in PM on a regular basis, you’ve probably heard of the Critical Path Method (CPM) of project management. Critical Path is a mathematical method of figuring out what your project tasks (the WBS), the time those tasks will take, and the dependencies between the tasks, mean in the greater sense of your project schedule as a whole.

I’m not a math-y person, but basically, the calculation of CPM is based on determining the longest path of the tasks you have planned until the end of the project and then calculating the earliest and latest that each task can start and finish without dragging the project out beyond its due date. By figuring it this way, the method decides which activities are “critical” and which can be delayed without pushing the project beyond its deadline. Those tasks on your task list which aren’t deemed critical have what is called “total float,” which means those tasks can be delayed without extending the project.

According to Wikipedia, the critical path is, “the sequence of project network activities which add up to the longest overall duration. This determines the shortest time possible to complete the project. Any delay of an activity on the critical path directly impacts the planned project completion date.”

Originally, CPM was based on logical dependencies and was very much about scheduling (which is one reason you need to be realistic about your task scheduling instead of just making up random numbers that sound good), but it didn’t necessarily take into heavy account the resources necessary for a project task, and how much resources can affect the duration. But of course, your schedule can be highly variable depending upon your resources, so resource leveling, a method of allocating your resources within your project schedule to resolve resource/schedule conflicts along the critical path, was added to the CPM to more realistically calculate the actual time a project is going to take.

Changing one variable -resource or time- can cause your entire critical path to shift, and it can throw your entire project way off course. Since all of your project tasks are linked together with dependencies and are either duration- or resource-dependent, when you’re estimating your task scheduling, it will behoove you greatly to finely drill into the actual duration or resources that will be required to complete the task. While the algorithm used for CPM has some flexibility built in with float and with fast-tracking (performing more tasks in parallel) and crashing the critical path (adding more resources to shorten the path of an existing activity or to keep it on schedule), it cannot be stated strongly enough that when you are making your estimates for a project task, the closer you come to making a real estimate, the better your chances of actually completing your project before the deadline.

So, though it may be tempting to throw around guesstimates when you’re determining your task scheduling and resources just to get something down on paper (or in Project), you’re not doing yourself any favors cutting those corners. You could wind up messing up your entire project.

The way I understand the critical path, it’s kind of like a time travel episode of a sci-fi show. The critical path you set up for your project is one universe or reality. But if you tweak one little variable, even just a leeeetle bit, suddenly, you could find yourself in a parallel universe -on a different critical path- and the outcome of everything will be different.

Of course, now that I’ve given you this dire warning about altering the universe with your project scheduling, and I Google “Microsoft Project” + “Critical Path” to see if that’s the default algorithm Project uses, I come up with a Microsoft Project blog post that basically says, “Eh, critical path. Sounds scary, but really isn’t so much a big deal.”

So I guess the truth lies somewhere in the middle: a critical path is important; it’s a core piece of successfully planning and executing a project. But it is adjustable. As long as you make reasonable estimates for your project tasks, you should be golden. No need to be all Chicken Little about it.

And hey, at least you don’t have to make all these calculations manually, right?

SharePoint Online

The cloud parts are functional components that extend your SharePoint Online environment in Microsoft 365.

Supports Classic and Modern sites for SharePoint Online/Microsoft 365

Small Business Pricing and Discounts

SharePoint

Top SharePoint Online Products

Experience greater power and savings by bundling our SharePoint apps and cloud parts.


Calendar Plus


Carousel


Employee Directory Plus


Org Chart Plus


Simple Search


Tabify


Tree View

 

On-Premises Only

These web parts extend SharePoint beyond its out-of-the-box capabilities by tailoring it to your requirements with Bamboo Solution’s growing portfolio of SharePoint Web Parts.

SharePoint 2016, 2019, 2022 – Classic Pages Only

SharePoint

Top On-Premises Only Products

Experience greater power and savings by bundling our SharePoint apps and web parts.


Calendar Plus


Data Viewer


Password Change


Password Expiration


Password Reset

 

Our team of Microsoft 365 Technology Consultants helps you get the most out of your Microsoft technology, we have the best Microsoft 365 talent to streamline your organization.

Consulting to Streamline Your Department

M365 Plus

Managed Services

Microsoft 365

Consulting to Streamline Your Department


Human Resources


Information Technology


Marketing Campaigns


Healthcare


Sales

 

Our Consultants Have What You Need

Federal Contractors