This Week in Bamboo (June 16th, 2013 – June 22nd, 2013)

This week in Bamboo, we released In/Out Schedule Board for SharePoint 2013 to the storefront. Please see below for details about this week’s release.

SA06 In/Out Schedule Board for SharePoint 2013 Release 1.3.79.2013

Initial Release on Microsoft SharePoint Foundation 2013 and Microsoft SharePoint Server 2013 this week in Bamboo. This build runs on SharePoint Foundation 2013 and SharePoint Server 2013. This release contains the same functionality as the equivalent version number of the SharePoint 2010 build of this product.

See the Known Issues and Limitations section for this release’s latest known issues and limitations. For information about using this product, read the Online Documentation.

Includes HW55 Navigators latest version 10.3.57.2013

Known Issues:

• When the Bamboo In and Out Status Board Web Part is used outside of the In/Out Schedule Board site (Site that is created from either template: Bamboo In/Out Schedule Board – User Info Mode template or Bamboo In/Out Schedule Board – Contact List Mode template), the calendar start date and end date will not be displayed as part of the status.

Limitations:

None